Landon School Addition


Project was a 20,000 square foot two story addition to the existing athletic facility. The new space houses the wrestling room, weight room, aerobics training room and offices. The project required detailed infrastructure work to interface with the existing building power, plumbing, controls and heating system. The new space was cooled by standalone rooftop vav equipment. Services included developing preliminary options to serve the new addition, construction administration and system commissioning. Tasks relevant to contract include work within Montgomery County, familiarity with local codes and humidity control and outside air conditioning for exercise environments.
Landon School Addition
• Academy Of Hope Interior Renovations
• Arlington Public Schools - Buck Property
DC School boiler replacement
• Arlington Public Schools Admin building 2nd
• Floor Connecticut Park Elementary School Study
• Friendship Charter School 2nd Floor Renovations
• Friendship Charter School 3rd Floor Renovations
• GW Univ.-2300 K Street Elec breaker analysis
• GWU - Academic Center Elevator Renovation
• GWU Academic Center Generator Upgrade
• GWU Generator
GWU Law Center Chiller Replacement
• GWU Thurston Hall Elevator
• GWU Thurston Hall Fire Alarm Replacement
GWU Thurston Hall Fire Suppression System
• Jewish School at Montpelier Building C
• Lewis Elementary Boiler Plant Renovation
• Logan Elememtary Boiler Plant Renovation
• Paul VI High School Chiller Plant Study
Potomac United Methodist Church
• Randle Highland School-switchboard