
Fairfax Nursing Home Addition
The scope of the project was a 6,000 square foot addition to an existing nursing home. The space included patient rooms, therapy rooms, recreation rooms and staff offices. The electrical, plumbing and fire suppression systems for the addition were extensions of the base building systems. The mechanical system was a complete stand alone system. The construction cost for the project is $2,600,000.
• Fairfax Nursing Center Addition
• AOC-ACF Lightning Protection
• Cornwall Hospital Chiller
• Jills House
• Fox Hill Bethesda Ass'd Living
• GWU - Academic Center Elevator Renovation
• GWU Academic Center Fire Alarm
• GWU Academic Center Generator Upgrade
• GWU Clock Tower Elevator Lobby Study
• Johns Hopkins APL Bldg 13 5th Fl North
• Johns Hopkins APL Bldg 13 5th Fl South
• Landsdowne Hospital Chiller
• Maplewood Assisted Living Domestic Water
• NNMC Bldg 27 HVAC Replacement
• NNMC Building 60 & 61 ADA Renovation
• Potomac United Methodist Church
• USGS Emergency Power for Tel. Rm
• USGS Generator USGS Generator and UPS
• USGS Physics Bldg Boiler USGS Summer Boiler
• Virginian Boiler Plant Modification
• V-NIH HVAC Upgrade
• AOC-ACF Lightning Protection
• Cornwall Hospital Chiller
• Jills House
• Fox Hill Bethesda Ass'd Living
• GWU - Academic Center Elevator Renovation
• GWU Academic Center Fire Alarm
• GWU Academic Center Generator Upgrade
• GWU Clock Tower Elevator Lobby Study
• Johns Hopkins APL Bldg 13 5th Fl North
• Johns Hopkins APL Bldg 13 5th Fl South
• Landsdowne Hospital Chiller
• Maplewood Assisted Living Domestic Water
• NNMC Bldg 27 HVAC Replacement
• NNMC Building 60 & 61 ADA Renovation
• Potomac United Methodist Church
• USGS Emergency Power for Tel. Rm
• USGS Generator USGS Generator and UPS
• USGS Physics Bldg Boiler USGS Summer Boiler
• Virginian Boiler Plant Modification
• V-NIH HVAC Upgrade
