This project was a 5,000 square foot expansion of a wireless telephone switching facility located in Nashville Tennessee. The new space was built within the shell space of an existing on-line facility. DesignTech acted as the lead consultant for the project leading a design team consisting of the MEP engineers, the architect, and the structural engineer. The growth space required the build out of a totally enclosed area within a tilt up flex-space building. The project required a complete new infrastructure. The mechanical system was comprised of N+1 cooling system including 225-tons of computer room cooling equipment and associated dry- coolers for heat rejection. The electrical system required an expansion of the existing distribution system featuring dual power path for the AC system and the battery backed 52-volt DC power.
The electrical infrastructure upgrade also included a new 400 KW stand-by generator. Fire suppression/detection system for the expansion included dry pre-action sprinkler system, a gaseous fire suppression system (FM-200) as well as a very early warning detection system (VESDA) electrical distribution system. The construction required integration with the existing operation with zero downtime for this 24x7 communication center. During the bidding and construction phase of the project, DesignTech worked closely with the construction manager to evaluate the contract bids and to provide construction administration services including regular site visits to work through the complicated construction phasing. At the completion of construction, DesignTech acted as the owners agent for all systems demonstration/commissioning.
• Sprint Herndon 4G Lab
• Nextel Brazil MSO II review
• Verizon Dulles Building addition
• Nextel Design Standards
• Verizon Rockville Bldg Addition
• Nextel Hanover UPS installation
• Nextel Peru MSO1 Upgrade Feasibility Study
• Nextel UPS Installation Standard
• Nextel-Nashville, TN Site Expansion
• Sprint Beltsville Switch Room Expansion
• Sprint Sterling Lab ACU Replacement
• Verizon 730 12th street Cooling Tower
• Sprint Sterling Lab Expansion
• Sprint Teterboro Control Room Relocation
• Verizon 722 12th Building Sale
• Verizon Building Additions/Upgrades
• Verizon Cameron Switchboard Replacement
• Verizon Chesapeake Pod C - Cal III Consolid
• Verizon Crystal City Building addition
• Verizon Fairfax Building Addition
• Verizon Fairfax Generator
• Verizon Germantown Bldg Addition
• Verizon Hyattsville Power Upgrade
• Verizon Poolesville Bldg Addition
• Verizon Sterling Park Building Addition
• Verizon Woodley 1st Floor Switchboard
• Verizon Woodley Chiller Plant Upgrade
• Sprint Hanover Generator and service study
• Sprint Hanover Generator Load Balance
• Sprint Silver Spring Generator Load Balance
