U.S. Geological Survey Generator & UPS Replacement

 

 

    U.S. Geological Survey Generator & UPS Replacement

Located in Reston, VA

Redundant UPS addition
$800,000 project cost estimated)
Reduce operating cost
Minimal downtime to operating data center

DesignTech implemented the replacement of the existing UPS and stand-by generators to improve operating efficiency and system reliability.

Dual bus power distribution using static transfer switches for redundancy
Replaced inefficient, over-sized motor generator UPS with redundant static unity
Replaced diesel generators with natural gas unit, appropriately sized for the load

DesignTech acted as the prime design consultant for the design-build project with Washington Gas Energy Systems acting as the Construction Manager under an area-wide agreement with GSA.

DesignTech implemented the replacement of the existing UPS and stand-by generators to improve operating efficiency and system reliability.

Dual bus power distribution using static transfer switches for redundancy
Replaced inefficient, over-sized motor generator UPS with redundant static unity
Replaced diesel generators with natural gas unit, appropriately sized for the load

DesignTech acted as the prime design consultant for the design-build project with Washington Gas Energy Systems acting as the Construction Manager under an area-wide agreement with GSA.

Bring me to the Project Details List or  Client List or Project List 

 

Home Up

DesignTech, Inc. Engineering Services - 10410 Kensington Parkway - Suite #200 - Kensington, MD 20895 - USA  Click for Information.

Send mail to Webmaster  with questions or comments about this web site.
Copyright © 2002 DesignTech Engineering Inc.
Last modified: February 18, 2004