MIDTOWN GENERATOR
The project scope of work included design for two 1,000 KW stand-by diesel generators to replace the existing three turbine generators.

VERIZON RIGGS RD. CHILLER PLANT UPGRADE
Replacement of split air-cooled chillers, chilled water pumps, and basement air handling unit.

VERIZON ROCKVILLE BUILDING ADDITION
8,000 sq. ft. addition to an existing 18,000 sq. ft. office and communications center including major MEP upgrades to the existing building infrastructure.

VERIZON BETHESDA BUILDING ADDITION
The Bethesda Central Communication office expansion was a major building expansion of a critical Verizon telecommunication building in downtown Bethesda, MD.