MIDTOWN GENERATOR
The project scope of work included design for two 1,000 KW stand-by diesel generators to replace the existing three turbine generators.

D.C. CRITICAL FACILITY COOLING TOWER REPLACEMENT
Replacement of four existing roof-mounted, 650-ton cooling towers with new. Project was completed in coordination with Holbert Apple & Associates structural engineers. This 300,000+ sq. ft. critical facility required a phased replacement of each cooling tower and detailed construction administration services to ensure a successful installation.

VERIZON RIGGS RD. CHILLER PLANT UPGRADE
Replacement of split air-cooled chillers, chilled water pumps, and basement air handling unit.

VERIZON HYATTSVILLE CHILLER PLANT UPGRADE
Phased demolition and upgrade of chilled water plant including air cooled condensers, chillers, and pumps.

ESPN SEC NETWORK
19,000 sq. ft. upgrade and expansion of the broadcast facilities for the SEC network including a studio, receiving/xray, and office spaces.

VERIZON ROCKVILLE BUILDING ADDITION
8,000 sq. ft. addition to an existing 18,000 sq. ft. office and communications center including major MEP upgrades to the existing building infrastructure.

VERIZON BETHESDA BUILDING ADDITION
The Bethesda Central Communication office expansion was a major building expansion of a critical Verizon telecommunication building in downtown Bethesda, MD.

DIRECTV UPLINK FACILITIES
Three nationwide 24x7 facilities requiring fully redundant electrical and mechanical systems. The three facilities are located in NH, AZ and WA.