Mechanical/Electrical/Plumbing Engineering Services

Innovative Designs and Solutions
  • Home
  • Projects
  • About
    • Leadership
    • Services
    • Lunch & Learn
  • Blog
  • Contact
  • Home
  • Projects
    • Leadership
    • Services
    • Lunch & Learn
  • Blog
  • Contact

New Gallery

  • All
  • Broadcast
  • Critical Facilities
  • Data Centers
  • Education
  • Energy Conservation
  • Healthcare
  • Historic
  • Hospitality
  • Infrastructure
  • Interiors
  • New Construction
  • Places of Worship
  • Restaurants
  • Retail
  • Telecommunications
CNN ELECTION CENTER STUDIO

CNN ELECTION CENTER STUDIO

DesignTech’s work at the CNN Washington DC Bureau included a multi-year phased execution of a master plan renovation of the facility.

MIDTOWN GENERATOR

MIDTOWN GENERATOR

The project scope of work included design for two 1,000 KW stand-by diesel generators to replace the existing three turbine generators.

D.C. CRITICAL FACILITY COOLING TOWER REPLACEMENT

D.C. CRITICAL FACILITY COOLING TOWER REPLACEMENT

Replacement of four existing roof-mounted, 650-ton cooling towers with new. Project was completed in coordination with Holbert Apple & Associates structural engineers. This 300,000+ sq. ft. critical facility required a phased replacement of each cooling tower and detailed construction administration services to ensure a successful installation.

VERIZON RIGGS RD. CHILLER PLANT UPGRADE

VERIZON RIGGS RD. CHILLER PLANT UPGRADE

Replacement of split air-cooled chillers, chilled water pumps, and basement air handling unit.

ESPN LONGHORN NETWORK

ESPN LONGHORN NETWORK

25,000 sq. ft. fit-out for the ESPN network dedicated exclusively to the University of Texas Longhorns.

VERIZON HYATTSVILLE CHILLER PLANT UPGRADE

VERIZON HYATTSVILLE CHILLER PLANT UPGRADE

Phased demolition and upgrade of chilled water plant including air cooled condensers, chillers, and pumps.

ESPN SEC NETWORK

ESPN SEC NETWORK

19,000 sq. ft. upgrade and expansion of the broadcast facilities for the SEC network including a studio, receiving/xray, and office spaces.

VERIZON ROCKVILLE BUILDING ADDITION

VERIZON ROCKVILLE BUILDING ADDITION

8,000 sq. ft. addition to an existing 18,000 sq. ft. office and communications center including major MEP upgrades to the existing building infrastructure.

WNYW HEATING UPGRADES

WNYW HEATING UPGRADES

Phase 1 in an effort to transfer the building heating system from low pressure steam to heating hot water as well as the air systems from constant volume reheat to variable air volume (VAV).

CNN WASHINGTON, DC

CNN WASHINGTON, DC

The 8th floor renovation phase was a phased build out of 24,000 sq. ft. of office space and television production support areas.

CHINA CENTRAL TELEVISION (CCTV)

CHINA CENTRAL TELEVISION (CCTV)

32,000 sq. ft. fit-out of the China Central Television broadcast station in which DesignTech was involved through study, selection, and design of their eventual space.

VERIZON BETHESDA BUILDING ADDITION

VERIZON BETHESDA BUILDING ADDITION

The Bethesda Central Communication office expansion was a major building expansion of a critical Verizon telecommunication building in downtown Bethesda, MD.

BROOKINGS INSTITUTE

BROOKINGS INSTITUTE

1,000 sq. ft. build out of a television facility in a commercial office building including two studios, new UPS distribution, and HVAC systems.

DIRECTV UPLINK FACILITIES

DIRECTV UPLINK FACILITIES

Three nationwide 24x7 facilities requiring fully redundant electrical and mechanical systems. The three facilities are located in NH, AZ and WA.

ERICKSON RLTV

ERICKSON RLTV

The RLTV, Retirement Living Television broadcasting facility and corporate data center is a 100,000 sq. ft. five level office building located at UMBC.

SPRINT 4G LAB HERNDON, VA

SPRINT 4G LAB HERNDON, VA

The project included 17,000 sq. ft. renovation comprised of electronics lab, DC power plant, RF testing chambers and UPS room.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Previous Next
CNN ELECTION CENTER STUDIO
MIDTOWN GENERATOR
D.C. CRITICAL FACILITY COOLING TOWER REPLACEMENT
VERIZON RIGGS RD. CHILLER PLANT UPGRADE
ESPN LONGHORN NETWORK
VERIZON HYATTSVILLE CHILLER PLANT UPGRADE
ESPN SEC NETWORK
VERIZON ROCKVILLE BUILDING ADDITION
WNYW HEATING UPGRADES
CNN WASHINGTON, DC
CHINA CENTRAL TELEVISION (CCTV)
VERIZON BETHESDA BUILDING ADDITION
BROOKINGS INSTITUTE
DIRECTV UPLINK FACILITIES
ERICKSON RLTV
SPRINT 4G LAB HERNDON, VA
facebook twitter linkedin-unauth instagram

Home / Contact / Blog

Mechanical/Electrical/Plumbing Engineering Services

Innovative Designs and Solutions

Mechanical/Plumbing/Electrical Consulting Engineering

DesignTech Inc | 10410 Kensington Pkwy, Kensington, MD, 20895, United States

facebook twitter linkedin-unauth instagram